Public Sector Decarbonisation Scheme: Phase 3
Maximise your PSDS funding
Phase 3 of the Public Sector Decarbonisation Scheme is providing £1.425 billion of grant funding over the financial years 2022-2023 to 2024-2025. It supports the aim of reducing emissions from public sector buildings by 75% by 2037, compared to a 2017 baseline, as set out in the Net Zero and Heat and Buildings strategies.
Maximise your PSDS funding with the help of EES Group and our range of renewable technologies. We offer the latest products in solar PV and LED lighting technology designed to meet your specific energy needs. Let our highly skilled team manage your project for you from survey, design and business proposal through to supply, installation and maintenance, with minimum impact on your day to day business.
Our solutions ensure maximum efficiency and reliability to significantly reduce Co2 emissions whilst saving on energy costs and creating a more sustainable future.
Talk to us about your specific requirements and we will find you the right solution to meet your needs, now and in the future.
Combat rising energy costs
CO2 emissions reduction
Utilise PSDS funding
Monitoring & maintenance packages
case studies
clients in your sector who have already harnessed Solar PV.
We have extensive experience working in both the Public and Private sector
environments, helping to decarbonise, reduce energy costs and future proof your facilities.
Maidstone & Tunbridge Wells Hospital
The project was for an occupational health facility operated as part of the NHS Property Services estate.
Maidstone and Tunbridge Wells NHS Trust is a large acute hospital Trust in the south east England, providing a full range of general hospital services, and some areas of specialist complex care to around 560,000 people living in West Kent East Sussex.
“EES Group were great to work with. They had a very professional project and installation team; their light fittings are excellent quality and at a great price. I would definitely recommend them.”
Taylor Road
EES Group successfully completed a Solar PV project for Leicester City Council at Taylor Road Primary School. The solar array will save the school a massive 7.88ct of carbon emissions each year. We are very proud to continue to support Leicester City Council with their decarbonisation strategy.
“EES Group installed LED lighting in our school building and we couldn’t be happier with the results. The lighting installed is excellent quality and their team were great to work with. We couldn’t recommend EES Group enough.”
Moat Community College
EESG were successful in a multi site competitive tender to install a solar PV array at Moat Community College in Leicester. The programme was a complete turnkey Solar PV installation with EESG operating as the designer and principal contractor, operating to the clients detailed scope of works. Due to examination timetables, RAMS and CPP were drawn up and approved within 1 week in order for the installation to be completed in 5 days as required by the client.
Go Northwest
Go North West had a requirement of 300-500 Lux levels in their depot and their original lighting was much lower than this. In the past year, Go North West had a number of advisories due to the dim lighting and not meeting lux levels.
Go North West had been spending an estimated £183,180 per annum on lighting energy costs. Following the installation of EESG’s LED lighting, this was significantly reduced to an estimated £43,374 saving the depot £139,806 per year on their electricity bills.
we want the implementation of energy efficient solutions to be easy so why not take advantage of our simple 3 step process.
01.
no obligation, free site survey
Contact one of our team to arrange a free site survey. Our expert design team will conduct an on-site report to assess your environment and requirements, so we can see how to help reduce your carbon emissions and reduce your energy costs.
02.
detailed commercial proposal
03.